1400 Block of Hudson Street to be Closed for Construction Work Beginning May 11, 2015
WASHINGTON, D.C. – May 11, 2015 – (RealEstateRama) — Construction activities will commence on May 11, 2015 on Hudson Street between 14th Street and 15th Street. During construction, which is expected to last four to six months, the 1400 block of Hudson Street will be closed to all vehicular and pedestrian traffic.
The purpose of the project is to address flooding and for utility work related to the construction of 1400 Hudson Street. The roadway will be re-graded, a rain garden will be built at the corner of 15th Street and Hudson Street, and stormwater detention systems will be installed under the street and sidewalks to alleviate localized flooding at Hudson Street and 15th Street.